Back to the woodworking page

The Kitchen cabinet remodel is almost complete.
It is being done on a budget so there is still staining to be done.

Here are the first two doors,
they are on the living room side of the kitchen breakfast bar.


unfinished, test fitted


finished and hung door-left


finished and hung door-right

All of the drawer fronts and most of the doors are stained.
Here are a few detail shots,


Kitchen side of breakfast bar


Set below sink, the last 2 will be installed when the sink is replaced.


Click on this pic for a detailed study of this set.
I really like the large knots I was able keep from chipping out.


This set is above the dishwasher and the right side of the sink

Back to the woodworking page